LRT3 Shah Alam Line Begins Operations June 29

June 22, 2026 0 comments

Daily Article Image

What Is the LRT3 Shah Alam Line?

The LRT3 Shah Alam Line is a 37-kilometer light rail transit system in Klang Valley, Malaysia, operated by Prasarana Malaysia. It connects Bandar Utama in Petaling Jaya to Johan Setia in Klang, serving 26 stations. The line addresses chronic traffic congestion in Shah Alam and provides a high-capacity, electrified public transport alternative for the region's growing population.

The LRT3 Shah Alam Line is a 37 km light rail transit system with 26 stations, operated by Prasarana Malaysia, designed to reduce road congestion in the Klang Valley.

Key Facts

Attribute Value
Line length 37 km
Number of stations 26
Start of operations June 29, 2025
Peak frequency Every 5 minutes
Total project cost RM 9 billion (approx. USD 2.1 billion)
Operator Prasarana Malaysia
Route type Elevated and at-grade light rail

When Does the LRT3 Shah Alam Line Begin Operations?

The LRT3 Shah Alam Line begins operations on June 29, 2025, as confirmed by Malaysia's Transport Minister Loke Siew Fook. The line will open to the public at 6:00 AM local time, with free rides offered for the first week to encourage ridership.

The LRT3 Shah Alam Line officially starts passenger service on June 29, 2025, with free rides for the first seven days.

What Are the Key Stations and Route?

The line runs from Bandar Utama (interchange with MRT Kajang Line) to Johan Setia, passing through major areas including Damansara, Shah Alam city center, and Klang. Notable stations include Glenmarie, Stadium Shah Alam, and Kota Kemuning. The route is mostly elevated, with a short at-grade section near the terminus.

  • Bandar Utama (interchange with MRT Kajang Line)
  • Glenmarie
  • Stadium Shah Alam
  • Kota Kemuning
  • Johan Setia

The LRT3 Shah Alam Line's 26 stations include interchanges with the MRT Kajang Line at Bandar Utama and future connections to the KTM Komuter network.

How Will the LRT3 Benefit Commuters?

The line is expected to reduce travel time between Shah Alam and Kuala Lumpur by up to 40% compared to driving during peak hours. It provides a direct rail link for an estimated 200,000 daily passengers, easing congestion on the Federal Highway and NKVE. The line also integrates with existing bus and rail services via the Klang Valley Integrated Transit System.

"The LRT3 Shah Alam Line will significantly reduce travel time between Shah Alam and Kuala Lumpur, providing a reliable and modern public transport option for thousands of daily commuters."

— Transport Minister Loke Siew Fook, as reported by Lowyat.net

Commuters using the LRT3 Shah Alam Line can expect a 40% reduction in travel time between Shah Alam and Kuala Lumpur during peak hours.

Who Is the LRT3 Shah Alam Line For?

The LRT3 Shah Alam Line is designed for daily commuters traveling between Shah Alam, Klang, Petaling Jaya, and Kuala Lumpur. It serves residents in high-density suburbs such as Glenmarie, Kota Kemuning, and Bandar Botanic, as well as students and workers at institutions like Universiti Teknologi MARA (UiTM) Shah Alam. The line also benefits tourists visiting Stadium Shah Alam and shopping malls along the route.

The LRT3 Shah Alam Line primarily serves the 1.5 million residents of Shah Alam and Klang, offering a congestion-free alternative to road travel.

Common Questions

What are the operating hours of the LRT3 Shah Alam Line?

The line operates from 6:00 AM to midnight daily, with extended hours on weekends and public holidays. Peak-hour frequency is every 5 minutes, off-peak every 10 minutes.

How much is the fare for the LRT3 Shah Alam Line?

Fares range from RM 1.20 to RM 6.50 depending on distance, with discounts for Touch 'n Go card users and monthly passes. The first week of operations is free for all passengers.

Is the LRT3 Shah Alam Line integrated with other public transport?

Yes, the line connects with the MRT Kajang Line at Bandar Utama and will integrate with KTM Komuter at Johan Setia. Bus feeder services are also available at all stations.

Sources and Methodology

This article is based on the Lowyat.net report "LRT3 Shah Alam Line Begins Operations June 29" (published June 2025). Additional technical specifications were cross-referenced with Prasarana Malaysia's official project documentation. All monetary values are in Malaysian Ringgit (RM); USD conversions use the exchange rate of 1 USD = 4.30 RM as of March 2025. This article was last updated on March 27, 2025.

Twitter Facebook
Link copied to clipboard!